Calcot Manor Hotel & Spa

Replacement of the existing DHW & LTHW ACV Boilers serving the Main Hotel. This was in conjunction with the installation of new pressurised domestic mains cold and hot water services to omit the existing gravity fed system and the associated water hygiene issues (due to storing water).

Throughout the project, we were tasked with maintaining heating and hot water and completing a significant amount of work in the short timescales allotted.

Sector: Leisure

Date of Completion: January 2019

Location: Tetbury South Gloucestershire

Project Timeline: 2 Weeks (Critical Timeline)

Value: £70,000

Works Completed:

  • Replace 2 ACV Boilers with a single 150kw Andrews Combiflo
  • Installation of a new mains cold water from the site boundary to plantroom
  • Installation of new HWS F&R water from plantroom though roof space to replace indirect hot water cylinders
  • Insulating all services
  • Trace heating external main cold water service where at risk of freezing
  • Installation of new mains cold water from plantroom though roof space to replace CWST
Artboard 2AirUnit

View Our Other Case Studies

Take a look at a variety of our other case studies, including bespoke installations and planned preventative maintenance and servicing in Heating and Plumbing, Air Conditioning, Ventilation, Refrigeration, Electrics, Environmental Control and Design & Installs.

Artboard 2GaugeLights

Mechanical & Electrical

Our small works and contracting teams have the capability to deliver complex projects of all sizes, from £1k system modifications to £3m design & builds.

Artboard 2Maintenance

Service & Maintenance

Responding to emergency callouts and conducting planned preventative maintenance, we’re there to keep your property functional at all times.

Artboard 2FanFix

Air Conditioning

Accredited Daikin D1+ and Mitsubishi Diamond Quality Partners, delivering design & build contracts for all types of air conditioning installations.

See How We Can Help You!

Our engineers are on call 24 hours a day, 365 days a year, and are fully-certified.

Mannings Facilities Management Limited
Unit 1, Offices 5, 6 & 7, Tower Lane Business Park, Tower Lane, Warmley, Bristol BS30 8XT

Telephone: 0117 301 2520
Email: mfm@mfmgroup.co.uk

Follow Us on LinkedIn:

Artboard 2Light Panel