King Edwards School is a private school located within the centre of Bath. The project comprised a new build drama studio and teaching spaces on the existing King Edwards School site.
Due to a future planned extension to The Roman Baths exhibit, we were engaged to undertake some modifications to the existing drainage and cold-water services.
Refurbishment of Vygon’s iconic offices and warehouse in Swindon. MFM were commissioned to designed and install a Daikin VRV heat recovery system and ventilation systems.
The complete removal and replacement of the heating system throughout Backwell school, supplied via districting heating mains to sub-plant rooms and one dedicated plantroom serving the sixth and largest teaching block.
To supply and install new plant within Seven Dials for BANES, providing two frame hung Vaillant EcoTEC boilers with header and plate heat exchanger, Grundfos Magna3 pumps, Mikrofill 3 and Blacks power seat valve.
Station Square is a modern four storey office building with over 47,000 square foot of space. We were tasked with refurbishment and install of a Daikin VRV heat recovery system for this prestigious office block.
Provision of preventative maintenance across many M&E specialities to achieve compliance with the British Standards across the Cabot Learning Federation.
The project included the install of Daikin VRV systems, replacement of condenser coils to slave unit, and preplacement of inverter compressor and control PCB boards.
Removal of faulty satellite condensers and upgrade to give additional support in case of fan failure additional heat loads. We also undertook re-routing of internal interconnecting pipe works to allow for mezzanine flooring to be laid.
Replacement of the existing DHW & LTHW ACV Boilers serving the Main Hotel. This was in conjunction with the installation of new pressurised domestic mains cold and hot water services to omit the existing gravity fed system